we thought we would put up a project timeline in pictures just to show you the various stages of the kitchen design and installation from start to finish.  this project is ongoing so the final images of the completed kitchen have yet to be loaded

1st site visit – 15th march – the designer visits the site for the first time and takes initial measurements. from this the design can be confirmed and electrical, plumbing and bulkhead drawings are prepared for the builder

designer measures up room

Picture 1 of 2

2nd site visit – 11th april – this time the designer checks tha all electrical and plumbing points are in their correct places

1st fix in place as per our plan

Picture 1 of 2

3rd site visit – 20th april – the stud walls are now in places and the designer completes a second full measure just to ensure that everything is proceeding according to plan

room beginning to take shape

Picture 1 of 2

4th site visit – 19th june – the kitchen installation has just commenced and will continue for another few days before the corian worktops are templated. the client also has a bench seat being manufactured which will incorporate into the kitchen and we have to wait for this to be installed prior to templating

installation has started

Picture 1 of 2

5th site visit – august 2012 – the kitchen has been completed along with the rest of the house and is ready for its photoshoot. finally after months of planning and years of dreaming, our clients can finally enjoy their dream kitchen!

surreal-kitchen-2

Picture 1 of 6